Winder, GA

About this dome

  • Dome profiles
    • Dome 1: 60', mid

David built the lower floor foundation for his 60′ diameter dome. He fabricated parts for his dome and raised the dome in mid-November, 2011. He is continuing to finish the dome during 2013. The dome is enclosed and he is working on the interior.